Buy DD101 LONG LEAD Part of Crl Components Inc with NSN 5910-00-678-8157
MPN: DD101 LONG LEAD
Alternate P/N: DD101LONGLEAD
Manufacturer: Crl Components Inc
NSN: 5910-00-678-8157
Item Name: Capacitor Fixed Cer
CAGE Code: 71590
FSC: 5910 Capacitors
Part number DD101 LONG LEAD is available for immediate shipping. The NSN for part number is 5910006788157. This part is manufactured by Crl Components Inc. It is described as Capacitor Fixed Cer. Would you like to request a quote for part number DD101 LONG LEAD? Please fill out the form.
The form includes various important fields such as your contact details, Need Parts By, and Quantity. Please make sure to fill out all these fields accordingly before clicking to submit the form. Our experts will review your answers for Need Parts By and Quantity to calculate your quote.
Upload RFQ Sheet
If you have more than one item, upload your spreadsheet here
NSN Information for Part Number DD101 LONG LEAD with NSN 5910-00-678-8157, 5910006788157
| NSN | FSC | NIIN | CLS | Hazmat | DEMIL | Cancelled NSN |
|---|---|---|---|---|---|---|
| 5910-00-678-8157 Item Description: Capacitor Fixed Cer | 5910 | 006788157 | 0 | P | ||
| CIIC | HCC | ESD | PMIC | Criticality | ENAC | |
| U | A | 0 | ||||
| Part Number | ISC | RNVC | RNCC | HCC | MSDS | SADC |
| Dd101 Long Lead | 1 | 1 | C | A |
Characteristics Data of NSN 5910-00-678-8157, 5910006788157
| MRC | Criteria | Characteristic |
|---|---|---|
| AAQL | BODY STYLE | W/O MTG FACILITIES, RADIAL TERMINALS |
| AARG | RELIABILITY INDICATOR | NOT ESTABLISHED |
| ABJT | TERMINAL LENGTH | 1.500 INCHES MINIMUM |
| ABPM | BODY DIAMETER | 0.290 INCHES MAXIMUM |
| ADAQ | BODY LENGTH | 0.156 INCHES MAXIMUM |
| AEBS | CENTER TO CENTER DISTANCE BETWEEN TERMINALS PARALLEL TO DIAMETER | 0.250 INCHES NOMINAL |
| AEBT | TERMINAL DIAMETER | 0.025 INCHES NOMINAL |
| AEBZ | SCHEMATIC DIAGRAM DESIGNATOR | NO COMMON OR GROUNDED ELECTRODE(S) |
| AGAV | END ITEM IDENTIFICATION | MISSILE, AI-TO-AIR, PHOEB=NIX (AIM-54); TELETYPE, MODEL 28; TEST CONSOLES, MINI-SACE; ENGINE, AIRCRAFT TF33-PW-102 (C-135E, EC-135H/K/P); MISSILE, AIR-TO-AIR, SPARROW (AIM-7); SUPPORT EQUIPMENT, MX PEACEKEEPER MISSILE; SUPPORT EQUIPMENT, B- |
| CQBQ | CAPACITANCE VALUE PER SECTION | 100.000 PICOFARADS SINGLE SECTION |
| CQFB | VOLTAGE TEMP LIMITS PER SECTION IN PERCENT CAPACITANCE CHANGE | -56.0/+22.0 WITHOUT VOLTAGE APPLIED SINGLE SECTION |
| CQJJ | NONDERATED OPERATING TEMP | -55.0 DEG CELSIUS MINIMUM AND 85.0 DEG CELSIUS MAXIMUM |
| CQWM | NONDERATED CONTINUOUS VOLTAGE RATING AND TYPE PER SECTION | 1000.0 DC SINGLE SECTION |
| CRTL | CRITICALITY CODE JUSTIFICATION | FEAT |
| CRTP | TOLERANCE RANGE PER SECTION | -10.00/+10.00 PERCENT SINGLE SECTION |
| CWJK | CASE MATERIAL | PLASTIC |
| CWPK | INSULATION RESISTANCE AT REFERENCE TEMP | 10000.0 MEGOHMS |
| CWSG | TERMINAL SURFACE TREATMENT | SOLDER |
| FEAT | SPECIAL FEATURES | WEAPON SYSTEM ESSENTIAL |
| TTQY | TERMINAL TYPE AND QUANTITY | 2 UNINSULATED WIRE LEAD |
Sought-After NSN Components List
Leading NSN Part Manufacturers